Top Mall Method (Small Diameter Boring Method)

Top Mall Method (Small Diameter Boring Method)
This is a trenchless construction method for the installation of buried pipelines using a drill boring machine. It is suitable for construction in locations where excavation is difficult, such as national roads and railway tracks, and being trenchless, it is a clean method that does not generate excavated soil.
1~2 item / All 2 items
-
Piping construction: "Top Mall Method" for non-excavation installation of pipelines! Construction case study.
We will excavate underground extensively without open-cutting and install communication cables, gas pipes, and pipes for water supply and drainage.
last updated
-
Small Diameter Pipe Underground Installation Work "Top Mall Method"
The "Top Mall Method" allows for extensive underground excavation without digging, enabling the installation of various communication cables, gas pipes, and plumbing for water supply and drainage. It also shortens construction time!