工期短縮
工期短縮
コンクリート部分を専門のプレキャスト工場で製造することにより、現場工期の短縮を実現します。
31~42 item / All 42 items
-

3D Truss Reinforcement "Kaiser Truss" for Civil Engineering
This is a Kaiser truss rebar made of material SD345.
last updated
-

Kaiser BARD floor panel
It achieves labor-saving and rational construction, along with excellent fatigue durability.
last updated
-

Kaiser System Stairs
Integrated structure of wall columns with rebar and special nuts! Precast stairs have been systematized.
last updated
-

Three-dimensional truss reinforcement "Kaiser Truss"
Achieving thin yet durable concrete components! Demonstrating various effects such as functioning as a spacer.
last updated
-
Dog run
Ensure a safe site environment! Half precast slabs with trusses serve as structural materials and formwork.
last updated
-
Half PC component "Kaiser PCF method"
Realization of labor-saving in construction, shortening of construction period, improvement of quality, reduction of on-site formwork assembly work, reduction of formwork materials, and enhancement of on-site safety.
last updated
-
Full PC component "Nemaki PC"
Achieving high durability that can withstand the impact of forklifts!
last updated
-
Full PC component "Vibration Isolation Cover for Load-Bearing"
Ensuring the safety and workability of the seismic isolation clearance section! We propose the PC (precast concrete) version of the seismic isolation cover with load-bearing performance.
last updated
-
Full PC component "Retaining Wall PC"
Precast retaining walls that contribute to shortening the construction process of warehouses.
last updated
-

Vibration Isolation Apron/Skirt
Streamlining the construction of the outer perimeter of seismic isolation buildings! We propose the PC (precast concrete) integration of the outer perimeter floor components with the tip section.
last updated
-

Machine Hatch
Precast components that contribute to improving the construction efficiency of equipment entry openings.
last updated
-

Future-compatible floor PC
Improvement of removability, low pollution construction, and realization of shortened construction period and reduced temporary works.
last updated