Temporary deadline LPF method

Temporary deadline LPF method
This is an introduction to the temporary closure method using liner plates.
1~17 item / All 17 items
-

Support for seismic reinforcement and pier construction! "Temporary Closure LPF Method" *Case study collection available.
Construction is possible even below a height of 1.5m! Achieving excellent water stopping performance with simplicity and speed!
last updated
-

Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method"
Over 90 construction achievements! We support bridge pier reinforcement nationwide with "shortened construction periods and expanded application scope"!
last updated
-

LPF method for temporary closure supporting pier reinforcement with abundant achievements.
Over 90 construction achievements and more than 110 target bridge piers. Supporting bridge pier reinforcement work nationwide safely and efficiently with proven know-how.
last updated
-

Low-headroom temporary closure LPF method contributing to shortening construction period.
A rational design that reduces the process by controlling custom components. A temporary closure method for bridge piers that can flexibly respond even under strict headroom conditions.
last updated
-

A temporary closure LPF method capable of adapting to various site conditions.
Wide-ranging support for rivers, seas, and dams. Temporary closure methods suitable for bridge pier reinforcement that are easy to adopt even under low headroom and narrow conditions.
last updated
-

Temporary Closure LPF Method Supporting the Maintenance and Management of Public Bridges
Widely adopted nationwide. A temporary closure method that accommodates low headroom and narrow conditions, allowing for the planned reinforcement of public bridges.
last updated
-

LPF method for temporary cofferdams for bridge piers to improve construction efficiency.
Balancing construction shortening and workability. A bridge pier temporary closure solution that is easy to implement even under heavy machinery restrictions and low headroom conditions.
last updated
-

Temporary closure LPF method suitable for bridge pier reinforcement work
Considering the actual conditions of repair and reinforcement work. A temporary closure method that achieves stable construction even under narrow and low headroom conditions.
last updated
-

Flexible response to design conditions: Temporary closure LPF method
It is possible to select shapes based on site conditions. A temporary closure method for bridge piers that is easy to consider from the design stage.
last updated
-

LPF method for temporary deadlines contributing to schedule management.
Optimize the process through material rationalization. A temporary formwork method for bridge piers that achieves both shortened construction time and reduced workload.
last updated
-

Temporary closure LPF method suitable for reinforcing river bridge piers.
Construction that takes into account the water discharge period and water level fluctuations is possible. A temporary closure method that allows for the reinforcement of bridge piers while considering the river environment.
last updated
-

Temporary closure LPF method supporting offshore pier construction
Corresponds to the reinforcement of bridge piers in marine and port areas. A temporary closure method with vibration-free construction to minimize the impact on surrounding facilities.
last updated
-

Temporary closure LPF method supporting seismic reinforcement of bridges
Corresponds to reinforcement and renewal work for existing bridges. A temporary closure method that is easy to consider even in seismic reinforcement projects with many constraints.
last updated
-

Low-altitude site response temporary deadline LPF method
Construction is possible with a temporary cutoff of about 1.0m for the bridge pier reinforcement work, which has many constraints.
last updated
-

Temporary closure LPF method suitable for short-term construction.
A bridge pier temporary closure method that makes it easy to organize work processes and can be easily implemented even during nighttime or within a limited construction period.
last updated
-

Temporary closure LPF method that can be constructed even under heavy machinery restrictions.
A temporary closure method that is easy to implement even for bridge pier reinforcement work where heavy machinery cannot be used, accommodating manual construction.
last updated
-

Temporary closure method for bridge pier reinforcement using liner plates.
Over 90 construction achievements and more than 110 target bridge piers. A liner plate temporary closure method that accommodates low headroom and narrow conditions, contributing to shortened construction periods.
last updated