日本海洋サービス 大阪支店 Official site

Temporary closure LPF method that can be constructed even under heavy machinery restrictions.

A temporary closure method that is easy to implement even for bridge pier reinforcement work where heavy machinery cannot be used, accommodating manual construction.

In bridge pier reinforcement work, the use of heavy machinery may be restricted due to site conditions and surrounding environments. The temporary cutoff LPF method accommodates manual construction, allowing assembly and installation even in low headroom and narrow spaces. It is utilized as a practical temporary cutoff method even at sites with construction constraints. *Please refer to the materials that include examples of manual construction. 【Features】 ■ Temporary cutoff structure using liner plates ■ Above-water assembly and underwater installation method ■ Suitable for low headroom and narrow areas ■ Construction that minimizes vibrations is possible

Provisional Deadline LPF Method HP

basic information

■Temporary Closure Shapes Circular, oval, rectangular, U-shaped For more details, please refer to the catalog. Feel free to request estimates or contact us. ■Materials for Estimate - Documents that can specify the location of the pier - PDF of pier structural drawings or general drawings, etc.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

【General Application Scope】 ■ Structures built in rivers, seas, dams, etc. 【Particularly Effective Application Scope】 ■ Advantages of platform (on water) work  ・Not affected by underwater environment  ・Locations where flow velocity changes ■ Structural characteristics  ・Low bridge piers  ・Locations where machinery cannot be used  ・Locations where vibrations cannot be applied *For more details, please refer to the catalog or feel free to contact us.

Provisional Deadline LPF Method Construction Catalog

PRODUCT

Provisional Deadline LPF Method Construction Achievements

PRODUCT

Distributors

Nihon Kaiyō Service Co., Ltd. has been engaged in underwater work in marine civil engineering since its establishment in 1972. Thanks to our efforts, we have reached our 43rd anniversary, receiving orders from government agencies as well as major general construction companies. Through our business, we strive to contribute to society and fulfill our social responsibilities by continuously working to develop technology and improve construction accuracy. Our company motto, "Do not be bound by the established, enrich your imagination, and always be a person who looks to the future," guides us as we work together as a team to enhance our technical skills and strengthen our corporate structure. We appreciate your continued support for Nihon Kaiyō Service Co., Ltd.

Recommended products