オリエンタル白石 本社 Official site

NAPP anchor method

Using hollow PC steel rods! Introducing prestress to connect existing and new concrete.

The "NAPP Anchor Method" is a construction technique that involves placing NAPP units in drilled holes of existing concrete structures and introducing prestress to bond the existing concrete with new concrete. There are no gaps at the joint sections, and it offers excellent durability. Depending on the conditions, the new section can also be made of precast blocks. 【Features】 - Reliable introduction of prestress - Labor-saving and reduction of construction time - Fewer drilled holes compared to rebar - Surface treatment of joint sections can be done with minimal cleaning, resulting in almost no noise *For more details, please refer to the PDF materials or feel free to contact us.

Related Link - http://www.orsc.co.jp/tec/con05_1.html

basic information

【Performance and Testing】 ■ Mortar Filling Confirmation Test ■ Fixation Performance Confirmation Test ■ Prestress Introduction Confirmation Test *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

【Achievements】 ■ Construction of the new bridge prevention work for the Hatsuzawa Overpass and others ■ Improvement work for traffic safety facilities on National Route 204 (Imabukubashi) ■ Fiscal Year 2009 Regional Revitalization and Detailed Grant Project Nojiri No. 2 Bridge ■ Construction of the upper structure of the Kaike Bridge on the municipal road Yumenji Temple No. 1 Line ■ Disaster recovery work for sedimentation ponds (displacement prevention device) *For more details, please refer to the PDF document or feel free to contact us.

Detailed information

Distributors

Recommended products