[ZEROSAI Implementation Case] Hakuba Village, Nagano Prefecture, Minamata Work Site - Landslide prevention dam construction with no signal connection, utilizing Starlink to manage on-site rainfall and water level information in the cloud.

シスメット 本社/福岡県北九州市 ・東日本オフィス/埼玉県入間市 ・北日本オフィス/北海道札幌市
【Before Introduction】 In the mountainous area of Hakuba Village, Nagano Prefecture, construction work was hindered by a lack of signal, making it difficult to observe rainfall and water levels. <Challenges> Due to the construction in the mountains, there is a risk of rising water levels from sudden heavy rain. It is necessary to obtain weather information relevant to the site. As a heatstroke prevention measure during the summer, it is necessary to record the heat index (WBGT) and submit it to the client. We have introduced our 【Natural Disaster Prevention System ZEROSAI】 along with 【wireless communication using Starlink】. *For more details, please visit our website or feel free to contact us.