[Compass PLUS Implementation Case] Caisson Installation Work - Crane Operation Wind Resistance Measures
There must be no obstructions, and wind speed must be managed rigorously. Technical proposals, creativity and ingenuity, marine conditions DX, safety measures during crane operations.
Utilizing the new features of 【Compass PLUS】, we will continuously monitor real-time wind speed observations along with wind speed forecasts. Additionally, we will share the same information with workers through the 【Disaster Prevention Light】 to achieve visibility across the entire site. 【Operating Environment】 〇 There should be no obstructions, and wind speed must be managed rigorously during crane operations to carry out caisson installation work. *For more details, please visit our website or feel free to contact us.
basic information
For more details, please visit our website or feel free to contact us.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
Ministry of Land, Infrastructure, Transport and Tourism, Prefectures, Cities and Towns, Local Governments Caisson installation work, dredging work, port construction, beach nourishment work Technical proposals, creativity and ingenuity
Related Videos
catalog(5)
Download All Catalogs


