Liquefaction countermeasure construction method

Liquefaction countermeasure construction method
We are implementing the simultaneous embedding method "OHO Drain Method," which suppresses the discharge of excavated soil to the surface and allows for the installation of drainage materials at a specified depth simultaneously with the completion of drilling, as well as construction methods for liquefaction countermeasures such as "High Grip Grout Method" and "Ultra-Multi-Point DP Method" using chemical injection.
1~4 item / All 4 items
-
OHO Drainage Method
No need for disposal of surplus soil and muddy water! A construction method that allows for the simultaneous installation of drainage materials during drilling.
last updated
-
High Grip Grout Method
[NETIS Registration] Chemical injection method that reduces injection loss during construction.
last updated
-
Super Multi-Point DP Construction Method
Various liquid injections are possible! A method that allows simultaneous injection at 16 points with one unit.
last updated
-
Expacker method
Possible extensive solidification! Construction injection method technology using permanent grout material.
last updated