Advancement construction method

Advancement construction method
We are engaged in construction using various methods such as the "Hume pipe jacking method," which incorporates a tunneling machine shell made of CPC steel pipes and includes recoverable driving equipment necessary for tunneling; the "CMT method"; and the "SS small method" for large and medium diameter pipe jacking. Additionally, we employ the "Cobra method," which allows for construction in rock and gravel layers using small diameter jacking, and the "Bell method," which enables long-distance and curved jacking using PVC pipes.
1~6 item / All 6 items
-
Hume pipe propulsion method
Simultaneously solve cost reduction and environmental protection! A construction method that can directly reach existing manholes.
last updated
-
CMT method
From soft soil to boulders and bedrock! Achieved the world's longest thrust distance of 1,447.6 meters (1 span)! A composite thrust construction method that accommodates various construction conditions.
last updated
-
SS Small Method
A mud density method suitable for soil conditions nationwide! We will take on even more challenging construction with our technology and track record!
last updated
-
Cobra method
Next-generation excavation work: mud-water and mud-soil pressure single-process small-diameter thrusting.
last updated
-
Bell method
"PVC Pipe Long-Distance Curved Pushing Method" - The world's first pushing technology that contributes to reducing life cycle costs.
last updated
-
Hard rock construction method
Air hammer type with directional control function for "shock drilling and propulsion method." The target soil types are infinite for gravel! Infinite for rock!
last updated