Product Categories
Featured products
Products/Services(12items)
news list
-
We will exhibit at the Construction Fair Hokuriku 2025 in Niigata.
We will be exhibiting at the "Construction Fair Hokuriku 2025 in Niigata" held at the Niigata City Industrial Promotion Center on October 1 (Wednesday) and October 2 (Thursday) of the 7th year of Reiwa. If you are having trouble with drainage repair work, please come by. We will provide optimal proposals based on past examples. Booth number: D-04
-
We will exhibit at the Highway Techno Fair 2025.
The event will be held on October 16 (Thursday) and 17 (Friday) at Tokyo Big Sight, East Halls 7 and 8. We will be exhibiting at the Highway Tech Fair 2025. At the Neplus Construction National Conference, we will also showcase newly developed flood prevention products, so if you are interested, please come by. If you are having trouble with ditch repairs or similar issues, please visit our booth. We will provide various proposals based on past cases.
-
We will exhibit at the Construction Technology Expo 2025 Kanto.
We will be exhibiting at the "Construction Technology Exhibition 2025 Kanto" held at Sunshine City Exhibition Hall C and D on November 19 (Wednesday) and 20 (Thursday), 2025. If you are having trouble with drainage repairs, please come and visit us. We will provide various proposals based on past cases. We will also showcase newly developed flood prevention products!

Aboutネプラス工法全国会
本部
Shortened construction period! A method for repairing ditches that allows for immediate traffic reopening.
The Neplus Method National Association is an organization that promotes the expansion of the "Neplus Method" for the repair of the upper part of drainage ditches, provides technical support, manufactures and supplies products, and offers technical assistance to construction partners. The Neplus Method involves removing only the damaged upper part of the drainage ditch with a specialized cutting machine and installing new repair products to renew the ditch. The construction period is quick, allowing for immediate traffic reopening if about 10 meters are completed in a day. Additionally, it can be easily implemented even in ditches close to structures or underground installations without the need for excavation. We have handled numerous drainage repair projects to date. If you have any issues with drainage work, please feel free to contact us.