鋼管杭・鋼管矢板工
鋼管杭・鋼管矢板工
硬質地盤・大口径・大深度に対応した鋼管杭および鋼管矢板施工のご紹介です。
1~6 item / All 6 items
-

Capsule Ho-Paira Method
Acquisition of construction technology examination certification! Press-in construction of steel pipe sheet piles into hard ground with low noise and low vibration.
last updated
-

Micro Joint Pile Method (Steel Pipe Sheet Pile Rock Embedding Method)
Acquisition of construction technology review certification! Directly driving steel pipe sheet piles into bedrock.
last updated
-

Large-diameter high-speed rock drilling system "PRD-ROSE method"
A system and construction that can be optimized according to site conditions using down-the-hole drilling!
last updated
-

Large-diameter deep steel pipe installation method (φ3200)
It is also used in construction to protect cities from flooding caused by guerrilla rainstorms! It is utilized in the construction of vertical shafts for access tunnels.
last updated
-

Screwdriver construction method
Birth of a multi-driver compatible with hard rock formations! High-speed drilling with a hydraulic casing pipe drilling device!
last updated
-

Narrow Space Clearance Method
Low vibration, low noise, casing drilling! Enables various pile construction in confined spaces!
last updated