クリテック工業 本社、大阪営業所、福岡営業所 Official site

Expansion Device Hybrid Joint [Construction Example, Ibaraki Prefecture]

We will introduce examples of the construction of hybrid joints (NS to LL type) for bridges, which excel in water resistance and durability.

Crittec Industries Co., Ltd. not only sells products but often takes full responsibility for installation work as well. We strive to improve our products by considering the issues that arise during installation and the condition of the removed existing expansion devices. 【Construction Example】 - Construction Location: Ibaraki Prefecture - Bridge Name: Fujimi Bridge - Product: L-60 and others - Comment: We also made calls for the safety of nearby residents and pedestrians. For more details, please contact us or request a catalog.

Related Link - http://www.cretec.jp/products/lineup/ns_ll.html

basic information

【Features】 ○ Compatible with small bridges to long bridges ○ Can accommodate all types of bridges ○ Ultra-low noise and comfortable driving ○ Long-term durability and maintenance-free ○ High water resistance ○ Safe and easy installation ○ Replaceable ○ Economical ● For more details, please contact us or request a catalog.

Price range

Delivery Time

Please contact us for details

Around 40 days (the delivery time may vary depending on the quantity, so please contact us for details).

Model number/Brand name

Hybrid Joint L-60

Applications/Examples of results

We have been adopted nationwide, primarily by the Ministry of Land, Infrastructure, Transport and Tourism, NEXCO, urban expressways, local governments, and other public organizations.

Line up(1)

Model number overview
L-60 Extension amount 60mm (±30mm)

[Expansion Device] Hybrid Joint <NETIS Registered Product> Leaflet

PRODUCT

[Expansion Device] Hybrid Joint Comprehensive Catalog

PRODUCT

【Expansion Device】 Hybrid Joint Comprehensive Catalog

PRODUCT

Distributors

Recommended products