ジオテック Official site

Subsidance correction work

Buildings that have tilted can be corrected with sinking repair work!

"Settlement correction work" introduces the flow from the occurrence of differential settlement to the correction work. A commonly used method is the steel pipe pile driving method, which supports the building's load by driving steel pipe piles into the supporting ground using jacks, thereby supporting and correcting the entire structure. [Contents] ■ Building level measurement (current situation assessment) ■ Flow from the occurrence of differential settlement to correction work ■ Steel pipe pile driving method ■ Overview of each method *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.jiban.co.jp/service/chinka/index.htm

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Method of repair work: "Settlement correction work"

PRODUCT

Distributors

Recommended products