ジオテック Official site

Proposal for Submergence Correction Work

If different subsidence occurs, leave it to us.

The decision on the method for settlement correction and its implementation will be made based on a site survey, taking into consideration the following points: - Site conditions (slope situation, condition of existing structures, foundation and exterior conditions, ground data, buried objects, etc.) - Whether the settlement is ongoing or has stabilized. - Whether to carry out a full correction under the foundation (for the purpose of preventing re-settlement) or a partial correction.

Related Link - https://www.jiban.co.jp/service/chinka/tinka_flow.…

basic information

The tilt of a building varies significantly depending on each specific building. To choose the best solution, it is necessary to consider the investigation items based on the building's structure, the degree of tilt, and the ground conditions.

Price range

Delivery Time

Model number/Brand name

Consulting for Settlement Correction Works

Applications/Examples of results

Optional survey (additional costs will be incurred.) Floor levels above the second floor By measuring the floor levels above the second floor of the building, we can gain a more detailed understanding of the building's tilt. Visual inspection under the floor We visually observe cracks in the foundation from beneath the floor to investigate the building's tilt in more detail. Ground investigation using SWS testing (Screw Weight Penetration Test) We examine the distribution of weak ground or fill that may cause the building to tilt.

Detailed information

Subsidance correction work

PRODUCT

Distributors

Recommended products