セイホープロダクツ 業務本部 Official site

  • SEMINAR_EVENT

Remote live inspection service

セイホープロダクツ

セイホープロダクツ 業務本部

■Live Inspection Start Our company conducts inspections to provide our clients with a deeper understanding of the effectiveness, safety, and installation information of the products they sell. This includes visits to our simulation studio, experimental laboratory, test house, and production line. By observing the visualization of product effects, safety tests, and durability test scenes, we have received feedback such as "I have gained a deeper knowledge of the products" and "I can confidently propose to end users." We are pleased to announce the launch of our 'Remote Live Inspection Service,' focusing on smoke simulation and security systems, which have been the main features of our inspections. Taking into account feedback such as "I am interested, but it's difficult to come to Fukuoka due to the distance" and "It's challenging to coordinate schedules for multiple people," the content will be a condensed version, but we will provide an interactive explanation similar to what you would experience in person. 【Flow of Remote Inspection】 ■ For underfloor ventilation... Approximately 30 minutes ■ For security... Approximately 20 minutes ■ Q&A... About 10 minutes

  • Date and time Monday, Jan 06, 2025 ~ Thursday, Dec 25, 2025
    09:00 AM ~ 05:00 PM
    For inquiries regarding remote inspections and schedule adjustments, please contact your sales representative or the Sales Management Department at headquarters.
  • Entry fee Free *There may be cases where a fee is required.

Related Documents

Related catalog

Remote Live Inspection Service [Remote Inspection]

TECHNICAL

Cultivating trust with underfloor ventilation fan users.

TECHNICAL

Hybrid System Special [Turbine Unit / Fuutaro Unit]

TECHNICAL

First, let's start with moisture control under the floor in the water area【HB-400EX (SS) / Fuutaro Basic (SS)】.

TECHNICAL

Foundation packing and foundation insulation method moisture issues under the floor [TYPE-C]

TECHNICAL

Foundation packing and foundation insulation method moisture issues under the floor [TYPE-D]

TECHNICAL

"Wind Noh Series" for heat prevention in the shed.

TECHNICAL

How does the temperature change with mechanical ventilation in the shed? [Kazenosuke Blower 24 / Kazenosuke Unit]

TECHNICAL

Optimal security tailored to family structure and lifestyle. 【Life Defense Air】

TECHNICAL

We will proceed with safety inspections for long-term use of underfloor and attic ventilation fans. 【Underfloor and Attic Ventilation Fans】

TECHNICAL

Special Discussion: "Humidity and Condensation Measures in Attics. The Importance of Ventilation."

OTHER

Corrosion prevention measures against condensation in humid environments.

TECHNICAL

Is a ventilation fan under the floor necessary?

TECHNICAL