シスメット 本社/福岡県北九州市 ・東日本オフィス/埼玉県入間市 ・北日本オフィス/北海道札幌市 Official site

  • PRODUCT

[Example of Technical Proposal Utilization] Wind Resistance Measures in Bridge Superstructure and Substructure Construction

シスメット

シスメット 本社/福岡県北九州市 ・東日本オフィス/埼玉県入間市 ・北日本オフィス/北海道札幌市

In bridge construction, it is very important to understand wind speed, strong winds, and rainfall forecasts when conducting crane operations to prevent crane tipping and material scattering. This can be utilized in technical proposals with the theme of "strong wind countermeasures." The criteria for deciding to halt crane operations will utilize the 【Natural Disaster Prevention System ZEROSAI】. 1. Install 【N Sensors】, 【Disaster Prevention Lights】, and 【Three-Color Indicator Lights】 on the site. *For more details, please visit our website or feel free to contact us.*

Related Links

Bridge Construction: Upper Works, Lower Works Wind Resistance Measures | ZEROSAI - Weather Observation, Forecasting, and Warning System

Related catalog

Civil Engineering and Architecture Natural Disaster Prevention System [ZEROSAI] Centralized management of weather information at construction sites!

PRODUCT

ZEROSAI collaborates with business chat! Sharing heavy rain and strong wind information with everyone on site!

PRODUCT

Disaster Prevention System ZEROSAI collaborates with LINE WORKS to automatically notify weather information via LINE WORKS.

PRODUCT

Collaboration between 【ZEROSAI】 and 【direct】 for automatic weather information notifications via direct.

PRODUCT