[Construction Example 16] Power-related Facility Roof Snow Melting (Hot Water Type, Exposed Method)
The exposed method using high-rigidity SGP piping was selected for the roof, aiming to average the circuit lengths.
This is an introduction to a case study of roof snow melting (hot water type, exposed method) at power-related facilities. Following the roof collapse accident at a power plant in 2017, measures to reduce snow load on roofs were adopted at various power-related facilities. In this facility, a combination of conventional sprinkling snow melting systems and manual snow removal was used, but ensuring the ability to sprinkle water on the ground was also prioritized, leading to the selection of an exposed method using high-rigidity SGP piping on the roof. Despite the presence of many existing structures and a complex piping configuration, efforts were made to average the circuit lengths, resulting in improved melting efficiency. 【Case Overview】 ■ Tsunan Town, Niigata Prefecture ■ Kerosene Boiler ■ 477m2 *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.