北越融雪株式会社 Official site

[Construction Example 16] Power-related Facility Roof Snow Melting (Hot Water Type, Exposed Method)

The exposed method using high-rigidity SGP piping was selected for the roof, aiming to average the circuit lengths.

This is an introduction to a case study of roof snow melting (hot water type, exposed method) at power-related facilities. Following the roof collapse accident at a power plant in 2017, measures to reduce snow load on roofs were adopted at various power-related facilities. In this facility, a combination of conventional sprinkling snow melting systems and manual snow removal was used, but ensuring the ability to sprinkle water on the ground was also prioritized, leading to the selection of an exposed method using high-rigidity SGP piping on the roof. Despite the presence of many existing structures and a complex piping configuration, efforts were made to average the circuit lengths, resulting in improved melting efficiency. 【Case Overview】 ■ Tsunan Town, Niigata Prefecture ■ Kerosene Boiler ■ 477m2 *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.hokuetsuyusetsu.com/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Examples] Solving Snow Problems! Snow Melting Equipment Examples 15-17

TECHNICAL

Snow Melting Equipment Comprehensive Catalog

CATALOG

Distributors

Recommended products