Soil-cement diaphragm wall method applicable to hard ground with N value of 100 or more.
The "CCC Method" is an abbreviation for the Chain Conveyor Cutter method, which uses CCC to construct ground improvement bodies. By mixing and blending the excavated ground with solidifying materials into soil cement, it enables the construction of underground continuous waterproof walls, temporary earth retaining walls, building foundations, grid-like improvements, and full improvements, among other applications, including soil contamination countermeasures. 【Features】 ■ The quality of the improved body is uniform in the vertical direction. ■ Capable of constructing gravel layers with an N value of 50 or more. ■ Immediate response is possible even if the depths differ within the same site. ■ Quick changeover of construction progress direction. ■ NETIS registration number QSK-12005-V. *For more details, please refer to the catalog or feel free to contact us.
basic information
【CCC Specifications】 ■ Output: 180kW (240HP) ■ Motor: 400/440V (water-cooled) ■ Chain speed: 0 to 60m/min ■ Chain tension: 23 to 55t ■ Drilling bit: Conical bit (for concrete breaking) ■ Excavation cross-section: Maximum 1.2m² (width 0.75 to 1m × length 1.2m) ■ CCC machine length: 9.2m to 37.2m ■ Excavation depth: 2m to 30m *For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
【Main Uses】 ■ Mountain and earth retention work ■ Underground continuous waterproofing walls ■ Seismic ground construction ■ Construction of final disposal sites *For more details, please refer to the catalog or feel free to contact us.