CDM-Land4 Method
Significant shortening of construction time is possible! A new ground improvement method that contributes to cost reduction.
The "CDM-Land4 Method" is a construction method that utilizes a set of four axes, allowing for simultaneous construction with four axes. This results in reduced construction time, lower costs, and excellent mixing performance, enabling the creation of high-quality improved ground. With the development of the extension rod, deep construction has become possible, achieving a construction height approximately 10 meters lower than conventional construction machinery and realizing a more efficient construction cycle compared to traditional extension methods. 【Features】 ■ Significant reduction in construction time ■ Contribution to cost savings ■ Creation of high-quality improved ground with minimal variation due to simultaneous four-axis mixing ■ High construction precision ■ Compatibility with a wide range of improvement methods For more details, please refer to the catalog or feel free to contact us.
basic information
【Specifications】 ■ Stirring blade shape: φ1,000mm / φ1,200mm / φ1,300mm ■ Maximum penetration depth from the ground surface: 40m / 30m / 20m ■ Improved area [m²/set] ・ Block shape: 2.83 / 4.21 / 5.00 ・ Circular lap shape: 2.00 / 4.34 / 5.11 ・ Single pile circular shape: 3.14 / 4.52 / 5.31 * For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.