太洋基礎工業 Official site

CDM-Land4 Method

Significant shortening of construction time is possible! A new ground improvement method that contributes to cost reduction.

The "CDM-Land4 Method" is a construction method that utilizes a set of four axes, allowing for simultaneous construction with four axes. This results in reduced construction time, lower costs, and excellent mixing performance, enabling the creation of high-quality improved ground. With the development of the extension rod, deep construction has become possible, achieving a construction height approximately 10 meters lower than conventional construction machinery and realizing a more efficient construction cycle compared to traditional extension methods. 【Features】 ■ Significant reduction in construction time ■ Contribution to cost savings ■ Creation of high-quality improved ground with minimal variation due to simultaneous four-axis mixing ■ High construction precision ■ Compatibility with a wide range of improvement methods For more details, please refer to the catalog or feel free to contact us.

basic information

【Specifications】 ■ Stirring blade shape: φ1,000mm / φ1,200mm / φ1,300mm ■ Maximum penetration depth from the ground surface: 40m / 30m / 20m ■ Improved area [m²/set]  ・ Block shape: 2.83 / 4.21 / 5.00  ・ Circular lap shape: 2.00 / 4.34 / 5.11  ・ Single pile circular shape: 3.14 / 4.52 / 5.31 * For more details, please refer to the catalog or feel free to contact us.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

For more details, please refer to the catalog or feel free to contact us.

Distributors

Recommended products