RBP wall construction method
[NETIS Registration] A cut slope reinforcement construction method that enables safe construction by combining reverse bolt panel version and rebar insertion work.
The "RBP Wall Method" combines reverse bolt paneling and rebar insertion work to prevent collapse through the stabilization of cut slopes and natural slopes. It is applicable in areas with low ground stress, places with limited space, and at cut locations adjacent to structures, for purposes such as road widening, land development, steep slope countermeasures, fall prevention measures, and slope stabilization works. Excavation of the ground is performed using a sloping method that cuts down from the top of the slope while securing it with reverse bolt panels. For more details, please refer to the catalog or feel free to contact us.
basic information
Features 1. It can be extended in either direction from any fixed point (line). 2. Excavation is carried out to the height determined by calculations, allowing for immediate insertion of rebar, ensuring constant slope stability. 3. While lowering, reinforcement (rebar) is added to the cut slope, making it possible to excavate at steep gradients even in areas with low ground strength. 4. The reverse bolt panel is securely connected with PC steel materials, forming a highly stable slope that has significant resistance to ground movement during events such as earthquakes. *For more details, please refer to the catalog or feel free to contact us.*
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.