ジオテック Official site

Ground reinforcement work | Achieving reliable ground improvement even on small sites with the Geo-Column method.

Smooth delivery even in narrow spaces and densely populated urban areas! The GeoColumn method provides space-saving and high-precision installation with a highly mobile specialized construction machine.

In building plans for densely populated urban residential areas or sites with narrow access roads, ground reinforcement techniques that ensure effective settlement measures while overcoming constraints on equipment delivery and turning space are required. The Geo-Column method employs compact and highly mobile specialized construction machinery and plant equipment, allowing for efficient work even in limited working spaces through deep ground mixing treatment technology. It mechanically mixes local soil and cement-based solidifying material slurry at depth to form homogeneous soil-cement column improvements underground. This method is primarily designed for sites with soft layers existing from GL-2m to GL-8m, and it secures the tips of the improvement bodies into good ground with a cohesive soil N value exceeding 3 and a sandy soil N value exceeding 4, establishing a depth of over 50 cm to completely prevent uneven settlement accidents caused by the weight of the building. With flexible machinery selection tailored to the site’s delivery conditions and a comprehensive management system by Geotech Co., Ltd., we support foundation reinforcement work in narrow sites quickly and safely.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

The construction specifications for the Geo-column method suitable for narrow sites are a standard improvement diameter of φ600mm and a corresponding depth of GL-2.0m to GL-8.0m. The construction machine employs a compact crawler-type heavy machinery with a total width of approximately 2.4 to 2.5m, allowing for entry from narrow roads and maneuverability within limited spaces. The penetration conditions for the supporting layer require a cohesive soil N value of over 3 and a sandy soil N value of over 4, with a fixation of more than 50cm. The standard addition amount of inorganic solidifying material is set at over 300kg/m3 for cohesive soil and over 250kg/m3 for sandy soil, with a real-time recording of construction torque and depth managed by an automatic control system.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for wooden, steel frame, and reinforced concrete (RC) single-family homes and apartments built in residential areas with narrow access roads, as well as in small urban lots and flagpole lots adjacent to neighboring houses (up to 3 stories, under 13 meters in height, and with a total floor area of less than 1,500 m²). It is placed directly under strip foundations or slab foundations to safely and reliably prevent uneven settlement in limited working spaces. Additionally, it is widely used for ground improvement work in challenging sites where the installation of large machinery is difficult, such as properties close to retaining walls or narrow renovation sites with existing wooden piles remaining.

Ground reinforcement work | High-reliability Geo-column method technical documentation that achieves reliable ground improvement even in narrow delivery routes and densely populated urban areas | Geotech

TECHNICAL

Ground Improvement Work "Geocolumn Method" | A highly reliable columnar improvement method that mixes and stirs cement milk with local soil | Geotech Co., Ltd.

PRODUCT

Ground reinforcement work | Real-time automatic collection of construction data to objectively prove solid quality with reliable numerical values using the GeoColumn method technical documentation | Geotech

TECHNICAL

Distributors

Recommended products