地盤補強(地盤改良)工事
地盤補強(地盤改良)工事
地盤補強工事について
1~30 item / All 181 items
-

Foundation Reinforcement Construction System "Ganko Oyaji"
A foundation reinforcement construction system with low cost, high safety, and short construction period!
last updated
-

Ground reinforcement construction [Certified method] ETP method
Steel pipe piles with advanced wings, Ministry of Land, Infrastructure, Transport and Tourism Minister Certification
last updated
-

Ground reinforcement work [Performance certification method] Cross-wing column method
Slurry-type mechanical stirring deep mixing method
last updated
-

Ground reinforcement construction [Performance certification method] Pure pile method
Pile foundation reinforcement method for detached houses
last updated
-

Ground reinforcement construction [Performance certification method] DM method
Pile-type ground reinforcement method using small-diameter steel pipes with tip wings.
last updated
-

Ground reinforcement work [Performance certification method] Σ-i method
A culmination of all the elements necessary for steel pipe piles.
last updated
-

Ground reinforcement work [Performance certification method] Tiger pile
High-performance hybrid column
last updated
-

Ground reinforcement construction [Performance certification method] RES-P method
Strengthening weak ground to protect the safety of homes.
last updated
-

Ground reinforcement work [Performance Guarantee Method] ETP-G Method
Rotary driven steel pipe piles suitable for small-scale buildings.
last updated
-

Ground reinforcement construction [Certified method] SMD method
Three-story, reinforced concrete structure, retaining wall, etc., optimal as a ground reinforcement method requiring government approval!
last updated
-

Ground reinforcement work using small-diameter steel pipe pile method.
Support your important home with a strong foundation.
last updated
-

Ground improvement work - surface improvement method
Support the important home with an improved version on the board.
last updated
-

Ground reinforcement work using the Geo-column method.
Support the important house with pillars of improvement.
last updated
-

Ground reinforcement construction lineup
https://www.jiban.co.jp/service/kouji/index.htm#01
last updated
-

i-LIFT Method
Easily lift up tilted or sunken houses!
last updated
-

Ground reinforcement work: Proposal for optimal ground reinforcement.
Optimal ground reinforcement without reverting from advanced construction methods.
last updated
-
Ground reinforcement work DM method [Performance certification method]
Advanced winged steel pipe ground reinforcement method that has obtained architectural technical performance certification.
last updated
-

Ground reinforcement work ETP-G method [Performance guarantee method]
ETP-G method for ground reinforcement using steel pipe with advanced wings that has obtained GBRC performance certification.
last updated
-
Ground reinforcement work ETP method [Certified method]
Ministerial certification and performance proof acquisition for advanced winged rotary driven steel pipe piles ETP method.
last updated
-
Ground reinforcement construction RES-P method [Performance certification method]
RES-P method for planar ground reinforcement that has obtained architectural technical performance certification.
last updated
-
Ground reinforcement work SMD method [Certified method]
The closing effect of the inner wing and reliable high bearing capacity, Ministry of Land, Infrastructure, Transport and Tourism certified SMD pile method.
last updated
-
Ground reinforcement work Σ-i method [Performance certification method]
Advanced pile-type ground reinforcement Σ-i method that has obtained architectural technical performance certification.
last updated
-
Ground reinforcement work Cross Wing Column Method [Performance Certification Method]
High-precision deep mixing method that has obtained GBRC performance certification.
last updated
-
Ground reinforcement work 【Geocore method】
High-precision geo-column method that prevents settlement with reliable lateral friction force.
last updated
-
Ground reinforcement work Tiger Pile [Performance Certification Method]
Acquisition of construction technical performance certification, Tiger Pile method using stepped steel pipes.
last updated
-
Ground reinforcement work Pure Pile method [Performance certification method]
Pure pile method that exhibits stable high strength unaffected by soil conditions.
last updated
-
Ground improvement work 【Surface improvement method】
Plate-type ground improvement and surface improvement methods that demonstrate excellent effectiveness in shallow soft layers.
last updated
-
Subsidance Correction Work 【i-LIFT Method】
i-LIFT method that lifts buildings from the ground through grout injection.
last updated
-
Shallow Correction Work Foundation Reinforcement Work System 【Ganko Oyaji】
Carbon fiber reinforcement system that revives non-reinforced and cracked foundations beyond new construction.
last updated
-

Subsidance correction work | Construction plan for jack-up work on a detached house while living in it.
A plan for jack-up construction of single-family homes to maintain the residents' living conditions. The tilt of the building will be corrected to the millimeter without the need for temporary housing, while you continue to live in your home.
last updated