ジオテック Official site

Ground reinforcement using the Tiger Pile method for detached houses | Geotech

We achieve shorter construction periods and cost reductions for single-family homes through improved support strength and construction efficiency.

In the construction of detached houses, shortening the construction period and controlling costs for ground improvement work are crucial issues that affect business profitability. If appropriate methods are not chosen for weak ground, it can lead to risks of uneven settlement, excessive construction, and large amounts of soil disposal, which can strain the budget. The Tiger Pile method is a hybrid technology that uses high-strength stepped steel pipes as core materials in soil cement columns. By increasing the vertical bearing capacity per improved body, it shortens the construction length, enabling optimization of the construction period and costs. 【Usage Scenarios】 - Foundation work for detached houses on weak ground - Residential construction projects requiring shortened construction periods - Sites aiming to reduce construction waste generation 【Benefits of Implementation】 - Significant reduction in construction length leading to shortened construction periods - Reduction in disposal and transportation costs due to decreased soil waste generation - Budget control through reduced number of pouring locations

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

【Features】 - High load-bearing capacity achieved through the fusion of soil cement and stepped steel pipes - High reliability based on GBR performance certification (No. 06-12 Rev. 4) - Efficient and rational component configuration according to required load-bearing capacity - Design flexibility suitable for buildings up to three stories above ground 【Our Strengths】 GeoTech Co., Ltd. provides a one-stop service from ground investigation to reinforcement design and construction. With real-time monitoring using the latest construction management equipment and a nationwide construction network, we offer ground reinforcement services that combine short construction periods, low costs, and high reliability, strongly supporting our customers' business plans.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.

Ground reinforcement work | A technical brochure providing high construction performance and high bearing capacity with the Tiger Pile method, achieving shortened construction periods and cost reduction | Geotech

TECHNICAL

Ground reinforcement work "Tiger Pile" | A hybrid ground reinforcement method combining stepped steel pipes and soil cement | Geotech Co., Ltd.

PRODUCT

Ground reinforcement work | Technical documentation that objectively demonstrates high quality through real-time data using the Tiger Pile method, which has obtained GBR-C performance certification | Geotech

TECHNICAL

Distributors

Recommended products