ジオテック Official site

Ground reinforcement using the Tiger Pile method for communication base stations | Geotech

Achieving high support capacity and short construction periods. A ground reinforcement solution that supports the rapid installation of communication base stations.

In the installation of communication base stations, rapid infrastructure development within a limited construction period and the assurance of adequate bearing capacity based on the ground conditions of the installation site are required. Choosing inappropriate construction methods on weak ground can lead to prolonged construction periods and increased costs due to soil disposal, which can negatively impact the overall profitability of the project. The Tiger Pile method, utilizing a hybrid technology that combines soil cement columns and high-strength stepped steel pipes, enhances the vertical bearing capacity per improved body and shortens the construction length, thereby strongly supporting the rapid installation of base stations. 【Application Scenarios】 - New installation and expansion work of communication base stations - Rapid foundation construction on weak ground - Sites that want to minimize the generation of construction waste 【Effects of Implementation】 - Significant compression of the construction period due to shortened construction length - Reduction of disposal and transportation costs due to decreased generated waste - Realization of reduced pouring locations and rational construction specifications through increased bearing capacity

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

【Features】 - High load-bearing capacity achieved through the fusion of soil cement and stepped steel pipes - Reduced construction time and minimized generation of surplus soil - High quality stability based on GBR performance certification - Efficient component configuration according to required load capacity - Real-time monitoring with the latest construction management equipment 【Our Strengths】 GeoTech Co., Ltd. is a specialized company in ground engineering that provides a one-stop service from ground investigation to reinforcement design and construction. Utilizing our nationwide construction network and extensive experience, we support our customers' business plans with services that balance short construction periods, low costs, and high reliability.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.

Ground reinforcement work | A technical brochure providing high construction performance and high bearing capacity with the Tiger Pile method, achieving shortened construction periods and cost reduction | Geotech

TECHNICAL

Ground reinforcement work "Tiger Pile" | A hybrid ground reinforcement method combining stepped steel pipes and soil cement | Geotech Co., Ltd.

PRODUCT

Ground reinforcement work | Technical documentation that objectively demonstrates high quality through real-time data using the Tiger Pile method, which has obtained GBR-C performance certification | Geotech

TECHNICAL

Distributors

Recommended products