すべての製品・サービス
31~44 件を表示 / 全 44 件
-

[Case Study] Stabilizing the water intake volume decreased due to clogging and sediment accumulation.
Stabilize water intake with WSS water screens! No clogging and no need for backwashing.
最終更新日
-

[Case Study] Freed from dangerous sediment removal work at necessary water sources during flooding.
The installation of a water screen reduces the number of cleaning operations and lightens the burden!
最終更新日
-

[Case Study] Preventing the destruction of the intake due to heavy rainfall with a secondary waterway to stabilize water intake.
Preventing the destruction of water intake points due to typhoons and heavy rainfall through auxiliary waterways significantly reduces the burden of water source management.
最終更新日
-

[Case Study] Mitigating the Risk of Drinking Water Loss in a Water Distribution Reservoir Where Installing an Emergency Shutoff Valve is Difficult
Introduction of a case that cleared the issue of installation space for emergency shut-off valves and eliminated the risk of drinking water loss.
最終更新日
-

[Case Study] Significant reduction in sludge removal work and cleaning frequency with water screens.
Introduction of a case where the frequency of sludge removal work and cleaning of the intake was significantly reduced using a water screen.
最終更新日
-

[Case Study] Detecting fluctuations in raw water turbidity and alleviating concerns about aluminum detection.
By installing a control instrument on the control panel and regulating the injection amount of the coagulant, the floc formation becomes stable!
最終更新日
-

[Case Study] Optimizing the Injection Amount of Coagulant to Stabilize Floc Formation
The turbidity meter and water intake flow meter control the injection amount of the coagulant, stabilizing floc formation!
最終更新日
-

【Issues that can be resolved】There are no contractors available to respond to unexpected troubles.
Engineers with a wide range of skills in electrical, instrumentation, control, machinery, and information communication are available for emergency response!
最終更新日
-

I would like to consult about the renovation and maintenance plans for water supply facilities.
Leave it to us, who are comprehensively involved in water supply facilities! We will provide planning proposals that address various challenges.
最終更新日
-

【Issues that can be resolved】Instability in water intake due to blockage of the water source intake.
The cleaning frequency of the intake screen at our company has decreased, significantly reducing the maintenance burden!
最終更新日
-

[Issues that can be resolved] Want to install an emergency shut-off valve but cannot cut off the water supply.
The emergency shut-off valve can be installed in the outflow pipe inside the water distribution tank, allowing for installation work without cutting off the water supply!
最終更新日
-

[Issues that can be resolved] Unable to secure space for the installation of emergency shut-off valves.
The emergency shut-off valve is installed on the outflow pipe inside the water distribution reservoir, eliminating the need for additional installation space.
最終更新日
-

【Issues that can be resolved】Sand flows into the filtration pond of the drinking water supply facility, making cleaning difficult.
Install a portable small sedimentation tank after the water intake facility to suppress the inflow of sand into the filtration area!
最終更新日
-

【Issues to be resolved】I want to renovate the water source, but heavy machinery cannot access it.
Since it can be fixed with anchor bolts, no civil engineering work is required! It solves the problem of not being able to bring in heavy machinery.
最終更新日